贺

Michael.H

I. Graduated from Zhejiang University. II. Used to worked for XX Water Center Science and Technology Office. III. Participated in a number of national large-scale water treatment project implementation and installation (membrane processing technology, ultrafiltration reverse osmosis. V. Representative of an oil production plant brackish water desalination project, the project smooth operation 16 years; Seawater desalination and its application implementation rules.

周

Aaron. Chou

Engineering department in charge of 18 years of experience in this industry. Participate in the operation of the water equipment under the condition of the installation and commissioning of equipment and turnkey engineering, for the all-round water treatment program implementation. Representative of a thermal power plant water system to run smoothly for 10 years, participate in and implement the upgrading of the owner system to win the follow-up of a number of systems operation renovation project.

唐

Barry. Don

Eight years in business. Involved in a number of Chinese petroleum, non-ferrous metal smelting, light industrial water system design and commissioning of the turnkey project. Owner of a cordial water system to address the intimate Don, good at reverse osmosis water, industrial soft, constant pressure frequency conversion water system of a non-ferrous metal company. Email: xabinrain_barry@yeah.net